Drinking Water System Improvements Project
Clear Creek Community Serv Dist
Clear Creek Community Services District is seeking drinking water system improvements for infrastructure upgrades.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 19th, 2025
Description
The Project consists of replacement of the existing Spring House structure; installation of 62 LF of restrained 8" pipe in a creek; pipe bursting (Additive Alternate 1) or slip lining (Additive Alternate 2) 305 Ft of existing 8" AC raw water main; installation of 122 Ft of 8" raw water PVC main; construction of a new 17 LF x 15 LF Park Pump Station including two 15 HP, VFD-controlled vertical turbine can pumps; reconnection to the existing emergency generator; installation of 393 Ft of 6" and 2,530 LF of 12" water main; construction of a 390,000 gallon prestressed concrete tank including yard piping; installation of 2,623 Ft of 8" water main and emergency intertie with the Westwood Community Services District (WCSD); and demolition of an existing pump station and hydro tank. Additive Alternate 3 includes a portable pump station.
This solicitation has some or all Local funding, additional requirements may apply. Per the Contract Documents, questions regarding the Bidding Documents shall be directed to Steve Wilson at swilson@paceengineering.us or (530) 244-0202 or to Tom Warnock at twarnock@paceengineering.us or (530) 244-0202.
Key Requirements
RFP Submission Requirements for Clear Creek Water System
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links