30 Inch Force Main Improvement
Hallandale Beach
Hallandale Beach is seeking force main improvement construction for infrastructure upgrades and capacity enhancements.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 1st, 2025
Description
The work includes construction of approx. 2,800 LF of 30" force main (FM) either by horizontal directional drill (HOD) or open cut or a combination of both. Work includes approx. 1 LS mobilization, 192 LF C900 PVC pipe DR 18-30", 160 LF 12" DI pipe, 1 EA 20" tapping sleeve & gate valve, 1 LS horizontal directional drilling, 465 LF 30" HDPE pipe SDR 11, 150 LF 48" 75 FT long steel conductor casing, 4,000 SY asphalt pavement and patch, 6,000 SY 1.5" milling & resurfacing, 5,000 LF 6" thermoplastic single white striping, 65 SY 4" sidewalk, 5,000 SY sodding/ landscaping, 1 LS tree removal and replacement.
This solicitation has some or all Federal funding, additional requirements may apply. Project location NE 14th Street from about 150 feet south Atlantic Shores Blvd and connecting to the City of Hallandale Beachs FM master meter on the SW corner of Funston Street and S 14th Street in the City of Hollywood. Any questions are to be submitted via email to kvohwinkel@cohb.org no later than NOVEMBER 6, 2025 by 5:00 P.M. The term of the contract will be five hundred forty-seven (547) calendar days. This project has a "prevailing wage" requirement.
Key Requirements
RFP Submission Requirements for Hallandale Beach Force Main
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links