Eastside Treatment Plant UV Replacement
Opportunity
Opportunity is seeking UV replacement work for the Eastside Treatment Plant for upgrades and maintenance.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 17th, 2026
Description
DESCRIPTION OF WORK: The WORK to be completed includes, but is not limited to, demolition, removal of existing treatment equipment, electrical controls, panels, and related appurtenances, modification of the existing concrete channel and related structures, installation of owner furnished ultraviolet (UV) equipment, installation of owner furnished electrical panels, motor control centers, breakers and related electrical equipment, control modification to existing equipment, structural modifications to the existing building roof, siding, and systems including louvers, testing, startup, and commissioning of the new treatment plant all in accordance with the Contract Plans, these Contract Provisions including the Technical Specifications, and the Standard Specifications.This work must be completed in the summer dry season window while the plant is offline. If work extends past the Completion of Work date noted in this section, Contractor will be subject to liquidated damage as described in these specifications.This project is funded, in part, by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from the solicitation of bids.The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Relate Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area.The proposed UV system and Motor Control Center (MCC) breakers have been pre-purchased by the Owner. The scope of supply of the owner furnished equipment is covered in Appendix A. The pre-purchased equipment will be delivered to the WWTP at 2500 Stephenson Avenue, Bremerton, WA by end of May 2026. The Contractor shall include provisions in their bid to transport and store such package and install the unit and associated work per contract documents.Please see the City of Bremerton bid posting for additional information and the Notice Inviting Bids:https://www.bremertonwa.gov/Bids.aspx
Key Requirements
RFP Submission Requirements for Opportunity UV Replacement
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links