Skanska Portage Bay Bridge Bid Opportunity - RFP 061 Asphalt Paving - WSDOT Stage 2 & Permanent HMA
Opportunity
Skanska is seeking asphalt paving for the SR520 Portage Bay Bridge replacement project.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
January 9th, 2026
Description
Project: SR520 Portage Bay Bridge ReplacementOwner: Washington State Department of Transportation (WSDOT)Bids Due: January 9, 2026 by 12:00pmSkanska is soliciting all interested subcontractors and suppliers, as well as certified Small, Veteran, Minority & Woman owned companies for the bid package listed below.RFP 061 Asphalt Paving - WSDOT Stage 2 & Permanent HMAAll relevant project information including plans and specifications can be found in the documents on BuildingConnected. Plans and specifications are available for viewing at our office by appointment, contact Khelsey Wilder to schedule or download free in BuildingConnected. Please return your bid and submit RFIs on BuildingConnected. If you need assistance getting access to BuildingConnected feel free to contact Khelsey Wilder atkhelsey.wilder@skanska.comor 206-798-2846.This project has 5% PWSBE, 3% VOB, 10% MBE and 6% WBE participation goals. Skanska intends to conduct itself in good faith with all interested subcontractors as well as certified PWSBE/VOB/MBE/WBE firms looking for subcontract opportunities on this project. If you are a PWSBE/VOB/MBE/WBE firm, please provide your certification with your proposal. All interested subcontractors, please indicate all lower tier PWSBE/VOB/MBE/WBE participation offered on your proposal as it will be evaluated with your price.Skanska will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. To permit maximum participation, when feasible Skanska will review breaking out scope packages and adjusting schedules to help permit maximum participation of PWSBE/VOB/MBE/WBE on the project. Subcontractor may be requested to furnish a bond, if required Skanska will pay bond premium up to 1%.Please call if we can assist you in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies.Skanska is an EEO/AA/Vet/Disability Employer. On behalf of the Skanska team, thank you for your interest in our project.Register for an e-newsletter of future bid opportunities athttps://bit.ly/PNW_interestedbiddersAbout the ProjectSkanska has been awarded the SR 520, I-5 to Montlake - I/C and Bridge Replacement project in Seattle, Washington. This project will replace the existing Portage Bay Bridge, with two new parallel variable depth segmental box girder bridges across Portage Bay, the existing SR 520 eastbound off-ramp structure to Montlake Boulevard East, the existing 10th Ave E and Delmar E under-crossings with a new Roanoke Lid Bridge, and provide approximately 75 retaining walls. This project will also extend the SR 520’s transit/HOV system from Montlake to I-5 and the cross-lake bicycle and pedestrian trail over Portage Bay to a new lid between Delmar Drive East and 10th Avenue East.If you have questions, please contact the project Inclusion manager, Suzanne Arklesuzanne@zanninc.comor Outreach Coordinator Gin HooksGin@zanninc.com206-371-7783
Key Requirements
RFP Submission Requirements for Skanska Portage Bay Asphalt
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links