RFPs
Rosemount, City of
Connemara Trail and CR 73 (Akron Ave) Roundabout

Connemara Trail and CR 73 (Akron Ave) Roundabout

Rosemount, City of

Rosemount, City of is seeking road construction and material supply for roundabout and trail improvements

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 17th, 2026

Description

Proposed project improvements include bituminous pavement removal, storm sewer improvements, water main improvements, grading, aggregate base, concrete curb and gutter, bituminous surfacing, pedestrian ramp improvements, and restoration. Remove Manhole/Catch Basin - 26 EA; Remove Bituminous Pavement 11,000 SY; Remove Bituminous Walk - 12,500 SF; Remove Concrete Walk 19,250 SF; Remove Curb & Gutter 5,800 LF; Remove Sewer/Water/Storm Pipe 1,285 LF; Common Excavation - 14,000 CY; Aggregate Base Class - 53,100 CY; Bituminous Pavement - 2,500 Ton; 4” Perforated PVC Pipe Drain - 7,000 LF; Drainage Structure (48” - 72”) 47 EA; RC Pipe Sewer (15”-24”) - 1,150 LF; Concrete Walk - 28,550 SF; Concrete Curb and Gutter - 6,500 LF; Seeding - 1.3 AC; Boulevard Topsoil Borrow - 500 CY; Silt Fence Type MS - 1,800 LF; 12” DIP Watermain - 85 LF. This solicitation has some or all Local funding, additional requirements may apply.

Key Requirements

RFP Submission Requirements for Rosemount Trail Roundabout

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.